Case Study of Millennium Point

Client: Millennium Point
Contractor: Haden Young Ltd
Products: Inertia Bases and EPDM Bellows

Millennium Point is a multi - tenanted complex comprising of four main parts : Discovery Centre, Technology Innovation Centre, Hub Atrium and IMAX Cinema.


Haden Young were appointed design and build contractors for the mechanical services, and as part of the package there was a need to control the noise and vibration transmitted from plant room equipment.

Due to the complexity of the layout of the plant room, J & P Supplies designed and provided the 6 bespoke inertia bases on which the heating and chilled water pumps are mounted.

The inertia bases measured between 3 metres and 4 metres in length, by over 1 metre in width, and were designed to have four pumps mounted on each.

All STOURFLEX® inertia bases are manufactured from fully welded steel frames with internal reinforcement, and are coated with corrosion resistant epoxy paint finish. J & P Supplies also provided over forty EPDM Tied Rubber Bellows to further reduce noise transmission on the pumps.


STOURFLEX® provides a complete design service. This includes free technical advice, site surveys and after sales support.

   
       
   

 

 

 

 
|

 

 

 

|
|<>
|
|
|
|
|
|
 
<> <>