Case Study of Leeds United Training Academy

Client: Leeds United Football Club
Consultants: HDP Building Services
Products: Non-Air® Air & Dirt Separator

Leeds United football club has opened a new football training academy which includes a three quarter size pitch, indoor hydrotherapy pool, medical centre and physiotherapy unit. Within the mechanical services package, the heating and chilled water systems needed to be protected from damage caused by dirt, air, sludge and solid particles.


If these particles and dirt are not removed from the system, efficiency is severely reduced. A build up of dirt in the system will lead to increased pressure drops, blockages and premature failing of components.

J & P Supplies provided our stainless steel Non-Air® range of air and dirt separators with built in strainer.

The 150mm Non-Air® unit will protect the heating and chilled water systems enabling the system to run far more efficiently.


J&P Supplies Ltd provides a complete design service. This includes free technical advice, site surveys and after sales support.

 