Case Study of GlaxoSmithKline

| Client: |
GlaxoSmithKline |
| Contractor: |
Axima Building Services Ltd |
| Products: |
Tied and Untied Rubber Bellows |
Opened in May 2002, the new
global headquarters for GlaxoSmithKline in Brentford has over a
million square feet of office space and was completed in only 26
months.
J&P Supplies provided over 250 untied and tied EPDM Rubber Bellows
to Axima Building Services as part of the mechanical services contract.
Axima selected the Stourflex Type JP01 and JP02 tied and untied
EPDM rubber bellows to reduce the noise and vibration from the pumps
on the heating and chilled water systems.
The STOURFLEX®
product range provided Axima with a cost effective solution, enabling
savings to be made and with stocks readily available the contractor
was able to schedule delivery to suit their requirements and complete
the project on time.